Institute for Transportation and Development Policy
Promoting sustainable and equitable transportation worldwide
中文
Photo
Article
Who We Are
ITDP China
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
0ther Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us
BRT Database
>
Cities List
Ahmedabad
Amsterdam
Bangkok
Beijing
Bogota
Brisbane
Bunous Aires
Cali
Cape Town
Changde
Changzhou
Chengdu
Curitiba
Dalian
Fuzhou
Guangzhou
Guayaquil
Guiyang
Hangzhou
Hefei
Islamabad
Istanbul
Jakarta
Jinan
Johannesburg
Kuala Lumpur
Lanzhou
Leon
Lianyungang
Lima
Los Angeles
Mexico City
Nagoya
Nanning
Nantes
Paris
Pune
Quito
Seoul
Shaoxing
Urumqi
Utrecht
Wenzhou
Wuhan
Xiamen
Yancheng
Yichang
Yinchuan
Yongzhou
Zaozhuang
Zhengzhou
Zhongshan
Zhoushan
>
Zhongshan
:
[Updated Time(
2015-07-23
)]
BRT Basics:
Segregated busways or bus-only roadways:
Pre-board fare collection and fare verification:
Level boarding and alighting:
Signal priority or grade separation at intersections:
Year system commenced:
2014
[Opened 27 January]
Peak throughput (passengers/hr/direction):
1,020
[16-Jul-2015, East of Nongshangyinhang Dongquzhihang stn,PM peak, east-west]
City centre peak hour speed:
24 km/hr
[16-Jul-2015,Peak hour]
Peak city centre buses/hr/direction:
26
[16-Jul-2015, Nongshangyinhang Dongquzhihang stn, PM peak, east-west]
Total length of dedicated busway:
12.6 km
Length including mixed traffic portions:
13 km
Location of busway lanes:
Centre of roadway
Number of BRT terminals:
1
[Huojugongjiao Suniu]
Operation and Service:
Network of routes and corridors:
High peak period operational speed (>20km/hr):
Most bus passengers in BRT corridors carried by BRT buses:
Net time saving for bus passengers in corridor:
Throughput >10,000 passengers/hr (one direction):
Throughput >20,000 passengers/hr (one direction):
Carries more than a mixed traffic lane (3000 pphpd):
Payment per bus-kilometre rather than per passenger:
Buses operating both in & out of BRT corridors:
Competitively bid operating contracts:
More than one BRT bus operator:
No operational subsidy from government:
[subsidy needed]
Independently operated fare collection system:
System control centre:
BRT system coverage (2-way roads) (1 fare):
64.6 km
[B1/B10/B11/B12/B13/B15:12.7/10.7/9.6/12/12/7.6]
Number of corridors:
1
Routes operating both inside & outside BRT roads:
5
[B10, B11, B12, B13, B15]
Routes operating only in busway corridors:
1
[B1]
Median cash fare:
1 yuan
Median smart card fare:
0.9 yuan
BRT bus operator(s):
Zhongshan Bus Co.
Operational mode:
direct-service
Average bus occupancy (peak hour, direction & point):
40
Operating hours:
6:00am-10:30pm
Stations:
Sliding doors in BRT stations:
Station size based on passenger demand:
Full weather protection on all station platforms:
>1 substop at >75% of stations (requires overtaking):
>1 stop position at stopping area at >75% of stations:
Real-time CCTV surveillance at all stations:
Number of BRT stations:
13
[of the 13, 3 were still being finished in May 2014]
Average distance between stations:
1,000m
Location of bus doorways:
Both sides
[Left for B1, both sides for B10,B11, B12, B13, B15]
Station platform height:
35cm
Most station substops:
1
[two stopping spaces]
DOWNLOAD NETWORK
BRT PHOTOS
Infrastructure:
Enhanced station (more than just a bus shelter):
Overtaking lanes at more than 75% of stations:
Includes BRT-only tunnels or bridges:
Low-emission vehicle technology (≥Euro III):
Automated fare collection and fare verification:
Stations away from intersections:
Stations with functioning passing lanes:
0
Fare system vendor:
Shanghai Damo
Sliding door system vendor:
Jiangsu Huimin
Surveillance system vendor:
Qingdao Hisense
Communications:
Distinctive BRT buses:
Real-time next bus information displays:
Distinctive marketing identity for system:
High-quality passenger information at stations:
High-quality passenger information on buses:
Audio announcements on BRT buses:
Distinctive BRT stations:
Access and Integration:
Bicycle parking at BRT stations:
Segregated bike lanes along main corridor(s):
Bike sharing in vicinity of BRT stations:
BRT Vehicle:
High capacity BRT buses:
Fleet of special BRT buses:
81
[6 18m buses, 15 12m buses, 60 9m buses]
Number of doors in BRT buses:
2
[2 for 12m, 3 for 18m; 2 right side and 1 left side for 9m; 2 right side & 2 left side for non-B1 12m]
BRT vehicle length:
9m, 12m, 18m
No. of seats in 12m BRT buses:
35
No. of seats in 18m BRT buses:
43
BRT vehicle fuel:
LNG
BRT bus manufacturer:
Kinglong
Fleet of 18m or larger BRT buses:
6
[6 18m buses, 15 12m buses, 60 9m buses]
Others:
Infrastructure cost per km:
110 m yuan for 12.9km
[2014 value]
BRT Standard score (GOLD, SILVER, BRONZE):
BRONZE
No
Yes
Partial
Who We Are
ITDP-CHINA
Our Team
History of ITDP
Jobs
What We Do
BUS 2.0
TOD
NMT
Parking and TDM
Shared Mobility
Where We Work
GuangZhou
YiChang
LanZhou
TianJin
Other Cities
News
Library
Publications
BRT Data
Transport Photos
ITDP Videos
Bicycle Data
Dockless Bike
Site Visit
Introduction
Guangzhou delegations
Yichang delegations
Contact Us